 |
Located in Waltham MA. USA
| |
Engineering
and Design Assistance |
| |
Complete Art,
Engineering and Manufacturing Facility |
| |
Full Screen
Printing, Die Cutting / Embossing, And Laser Cutting Capability |
| |
SMT And LEDs
and EL Lamps |
| |
Quality Assurance |
| 1. |
Typical 24-hour
turnaround for most quotes. Additional components or subassemblies
require 48 hours. |
| 2. |
We accept documents
in the following PC formats. (.dwg, .dxf, .ai, .eps, corel, .igs,
gerber) |
| 3. |
After approval
of design, prototypes can be produced in 5 to 15 working days depending
on complexity and component lead times. |
| 4. |
Once approved,
prototype documentation, tooling, and approved samples can go directly
to production at our Asian facilities. |
AFTER THE ORDER IS PLACED
| 1. |
Strict quality
control measures are followed, evidenced by ISO9001 certification.
(Cert. #041008978 ) |
| 2. |
Internal Test
Lab We can generate test reports including graphical print
outs of actuation force and full actuation life test data. Exact color
matching using spectrophotometer. |
| 3. |
C of C if required |
| 4. |
JIT delivery
from either the USA or Taiwan or China (Q4/99). |
Contact Us For Complete
Information
|